Le Mon, 21 Mar 2022 11:36:34 -0700,
Jakub Kicinski [off-list ref] a écrit :
quoted
Hi Jakub,
Ok, to be clear, you would like a series which contains all the
"base" fwnode functions that I'm going to add to be sent separately
right ? And then also split i2c/net stuff that was sent in this series ?
I'm mostly concerned about conflicts, so if you can get the entire
series into 5.18 before the merge window is over then consider it
acked. If it doesn't make 5.18 looks like you'd need to send patches
1 and 2 as a PR so that both the i2c and net trees can pull it.
Once pulled send patch 6 out to net-next. Does that make sense?
Yes totally, I guess I'll go for I2C only and then I'll move on with
next patches individually later. No need to hurry.
--
Clément Léger,
Embedded Linux and Kernel engineer at Bootlin
https://bootlin.com