Re: [PATCH net-next v2 09/10] net: phy: Put interface into oper testing during cable test
From: Florian Fainelli <f.fainelli@gmail.com>
Date: 2020-05-05 03:24:46
From: Florian Fainelli <f.fainelli@gmail.com>
Date: 2020-05-05 03:24:46
On 5/4/2020 5:18 PM, Andrew Lunn wrote:
Since running a cable test is disruptive, put the interface into operative state testing while the test is running. Signed-off-by: Andrew Lunn <andrew@lunn.ch>
Reviewed-by: Florian Fainelli <f.fainelli@gmail.com> -- Florian