Re: [PATCH 3/3] Enable parallel tests
From: Johannes Schindelin <hidden>
Date: 2016-06-15 22:45:07
Hi, On Fri, 8 Aug 2008, René Scharfe wrote:
Johannes Schindelin schrieb:quoted
This commit does so, by inspecting the MAKEFLAGS variable to detect if the option "-j" or "--jobs" was passed to make. In that case, the test is run with the new "--parallel" option.How about making the test harness be able to run multiple tests in parallel by default, i.e. always use a different trash directory name for each test, without adding the new option? The implementation would be a bit simpler (no -j detection needed) and the documentation would be simpler, too.
I am totally opposed to dropping the -j detection. This is what cost me 3 hours to research/implement. *sighs*
quoted
*) break ;; esac@@ -449,6 +454,11 @@ test_done () { # we will leave things as they are. say_color pass "passed all $msg" + + test ! -z = "$remove_trash" &&This test succeeds always, because = is not an empty string.
Thanks. Ciao, Dscho