Thread (13 messages) flat view 13 messages, 4 authors, 2024-07-08

Re: [PATCH v3 iproute2 0/4] Multiple Spanning Tree (MST) Support

From: David Ahern <dsahern@kernel.org>
Date: 2024-07-07 16:16:12
Also in: bridge

On 7/6/24 1:56 PM, Stephen Hemminger wrote:
The original point was to have kernel -next and iproute2 -next branches
and have support arrive at same time on both sides. The problem is when
developers get behind, and the iproute2 patches arrive after the kernel cycle
and then would end up get delayed another 3 to 4 months.
Then the userspace patches should be sent when the kernel patches are
merged. Period. no excuses. Any delay is on the developer.
Example:
	If mst had been submitted during 6.9 -next open window, then
	it would have arrived in iproute2 when -next was merged in May 2024 and
	would get released concurrently with 6.10 (July 2024).
	When MST was submitted later, if it goes through -next, then it would
	get merged to main in August 2024 and released concurrently with 6.11
	in October. By merging to main, it will be in July.
Same exact problem with netkit and I told Daniel no. We have a
development policy for new features; it must apply across the board to
all of them.
I understand your concern, and probably better not to have done it.
You applied patches for a new feature just a week or two before release.
It is just wrong. It would be best to either back up the branch or
revert them.
The problem with accepting things early is the review process gets
truncated, and new features often have lots of feedback.
I see no problem here; that is normal development work.