Thread (49 messages) flat view 49 messages, 4 authors, 2016-06-04

Re: [PATCH net-next 08/17] net: dsa: Copy the routing table into the switch structure

From: Florian Fainelli <f.fainelli@gmail.com>
Date: 2016-06-03 21:21:30

On 06/03/2016 09:44 AM, Andrew Lunn wrote:
The new binding will not have a chip data structure, it will place the
routing directly into the switch structure. To enable backwards
compatibility, copy the routing from the chip data into the switch
structure.

Signed-off-by: Andrew Lunn <andrew@lunn.ch>
Reviewed-by: Florian Fainelli <f.fainelli@gmail.com>
-- 
Florian
Keyboard shortcuts
hback out one level
jnext message in thread
kprevious message in thread
ldrill in
Escclose help / fold thread tree
?toggle this help