On Thu, Jun 09, 2011 at 01:02:13AM +0800, Brad Campbell wrote:
On 08/06/11 11:59, Eric Dumazet wrote:
quoted
Well, a bisection definitely should help, but needs a lot of time in
your case.
Yes. compile, test, crash, walk out to the other building to press
reset, lather, rinse, repeat.
I need a reset button on the end of a 50M wire, or a hardware watchdog!
Not strictly on-topic, but in situations where I have machines
that either don't have lights-out facilities or have broken ones
I find that network controlled power switches to be very useful.
At one point I would have need an 8000km long wire to the reset switch :-)
--
To unsubscribe, send a message with 'unsubscribe linux-mm' in
the body to majordomo@kvack.org. For more info on Linux MM,
see: http://www.linux-mm.org/ .
Fight unfair telecom internet charges in Canada: sign http://stopthemeter.ca/
Don't email: <a href=mailto:"dont@kvack.org"> email@kvack.org </a>