[PATCH] sched/rt: Don't pull tasks of throttled rt_rq in pre_schedule_rt()

Subsystems: scheduler, the rest

STALE4972d

2 messages, 2 authors, 2013-01-25 · open the first message on its own page

[PATCH] sched/rt: Don't pull tasks of throttled rt_rq in pre_schedule_rt()

From: Kirill Tkhai <hidden>
Date: 2012-12-25 08:20:59

The patch aims not to pull tasks of throttled rt_rqs
in pre_schedule_rt() because thay are not able to be
picked in pick_next_task_rt().

There are three places where pull_rt_task() is used:

1)pre_schedule_rt()
If we pull a task of a throttled rt_rq it won't be picked
by pick_next_task_rt(), because throttled tasks are dequeued
by sched_rt_runtime_exceeded(). So this action is unnecessary.

2)prio_changed_rt()
A pulled task of higher priority leads to reschedule of current
rq's task. The schedule() will occur with the first hw interrupt
so there is possibility the throttled rt_rq will unthrottle and
it will be queued during this time.
(In case of preemptable kernel schedule() occurs during
preempt_enable() in call of __task_rq_unlock(). But its lock is
unlocked so there is no guarantee the rt_rq won't be queued).

3)switched_from_rt()
The same as prio_changed_rt().

Signed-off-by: Kirill V Tkhai <redacted>
CC: Steven Rostedt <rostedt@goodmis.org>
CC: Ingo Molnar <mingo@kernel.org>
CC: Peter Zijlstra <peterz@infradead.org>
CC: linux-rt-users
---
 kernel/sched/rt.c |   21 +++++++++++++++++----
 1 file changed, 17 insertions(+), 4 deletions(-)
diff --git a/kernel/sched/rt.c b/kernel/sched/rt.c
index 418feb0..567908a 100644
--- a/kernel/sched/rt.c
+++ b/kernel/sched/rt.c
@@ -1708,7 +1708,17 @@ static void push_rt_tasks(struct rq *rq)
 		;
 }
 
-static int pull_rt_task(struct rq *this_rq)
+static inline int remote_rt_rq_throttled(struct task_struct *p, int remote_cpu)
+{
+	struct rt_rq *rt_rq = rt_rq_of_se(&p->rt);
+	struct rt_bandwidth *rt_b = sched_rt_bandwidth(rt_rq);
+
+	rt_rq = sched_rt_period_rt_rq(rt_b, remote_cpu);
+
+	return rt_rq_throttled(rt_rq);
+}
+
+static int pull_rt_task(struct rq *this_rq, bool unthrottled)
 {
 	int this_cpu = this_rq->cpu, ret = 0, cpu;
 	struct task_struct *p;
@@ -1768,6 +1778,9 @@ static int pull_rt_task(struct rq *this_rq)
 			if (p->prio < src_rq->curr->prio)
 				goto skip;
 
+			if (unthrottled && remote_rt_rq_throttled(p, this_cpu))
+				goto skip;
+
 			ret = 1;
 
 			deactivate_task(src_rq, p, 0);
@@ -1791,7 +1804,7 @@ static void pre_schedule_rt(struct rq *rq, struct task_struct *prev)
 {
 	/* Try to pull RT tasks here if we lower this rq's prio */
 	if (rq->rt.highest_prio.curr > prev->prio)
-		pull_rt_task(rq);
+		pull_rt_task(rq, true);
 }
 
 static void post_schedule_rt(struct rq *rq)
@@ -1890,7 +1903,7 @@ static void switched_from_rt(struct rq *rq, struct task_struct *p)
 	 * now.
 	 */
 	if (p->on_rq && !rq->rt.rt_nr_running)
-		pull_rt_task(rq);
+		pull_rt_task(rq, false);
 }
 
 void init_sched_rt_class(void)
@@ -1949,7 +1962,7 @@ prio_changed_rt(struct rq *rq, struct task_struct *p, int oldprio)
 		 * may need to pull tasks to this runqueue.
 		 */
 		if (oldprio < p->prio)
-			pull_rt_task(rq);
+			pull_rt_task(rq, false);
 		/*
 		 * If there's a higher priority task waiting to run
 		 * then reschedule. Note, the above pull_rt_task

Re: [PATCH] sched/rt: Don't pull tasks of throttled rt_rq in pre_schedule_rt()

From: Steven Rostedt <rostedt@goodmis.org>
Date: 2013-01-25 02:47:57

Sorry for the late reply.

On Tue, 2012-12-25 at 12:20 +0400, Kirill Tkhai wrote:
The patch aims not to pull tasks of throttled rt_rqs
in pre_schedule_rt() because thay are not able to be
picked in pick_next_task_rt().

There are three places where pull_rt_task() is used:

1)pre_schedule_rt()
If we pull a task of a throttled rt_rq it won't be picked
by pick_next_task_rt(), because throttled tasks are dequeued
by sched_rt_runtime_exceeded(). So this action is unnecessary.

2)prio_changed_rt()
A pulled task of higher priority leads to reschedule of current
rq's task. The schedule() will occur with the first hw interrupt
so there is possibility the throttled rt_rq will unthrottle and
it will be queued during this time.
(In case of preemptable kernel schedule() occurs during
preempt_enable() in call of __task_rq_unlock(). But its lock is
unlocked so there is no guarantee the rt_rq won't be queued).

3)switched_from_rt()
The same as prio_changed_rt().
These are pretty much hot paths. They are done rather commonly. My
concern is that we are adding overhead here that can be done in a much
less common path.

I'm wondering if we couldn't use the pushable_task list for finding the
next highest rt task. That may even speed up the fast path if we do so.

Then, when an rq gets throttled, which shouldn't be often, we can remove
all the tasks from the pushable_task list, and add them back when the rq
is comes back up.

Then, by just using the pushable_task list, we can achieve this goal.

We have to look to see what prevents us from using that list.

-- Steve

Keyboard shortcuts
hback out one level
jnext message in thread
kprevious message in thread
ldrill in
Escclose help / fold thread tree
?toggle this help